- Overview of Capacity Calculation Methodology (CCM) project
- Methodology and processes
- Updates and newsletter
- Upcoming Stakeholder Events
- Day-ahead (DA) and Intraday (ID) (ATCE) Capacity Calculation
- DA/ID (ATCE) CCM EPR
- Post go-live of DA/ID (ATCE)
- Intraday (ID) Flow-based Capacity Calculation
- Long-term (LT) Capacity Calculation
- Balancing timeframe (BT)
Abbreviations
ACER Agency for the Cooperation of Energy Regulators
ATC Available Transmission Capacity
ATCE ATC Extraction
BT Balancing Timeframe
CACM Capacity Allocation and Congestion Management
CACM GL Capacity Allocation and Congestion Management Guideline
CC Capacity Calculation
CCM Capacity Calculation Methodology
CCR Capacity Calculation Region
CGM Common Grid Model
CID Congestion Income Distribution
CNE Critical Network Element
CNEC Critical Network Element & Contingency
CZC Cross-Zonal Capacity
DA Day-ahead
DSO Distribution System Operator
EB Electricity Balancing
EDD Energy Delivery Day
ENTSO-E European Network of Transmission System Operators for Electricity
EPR External Parallel Run
FB Flow-Based
FBMC Flow-Based Market Coupling
FCA Forward Capacity Allocation
FCA GL Forward Capacity Allocation Guideline
GL Guideline
GSK Generation Shift Key
ID Intraday
IGM Individual Grid Model
IPR Internal Parallel Run
LT Long Term
MC Market Coupling
MCO Market Coupling Operator
NCI Network Code Implementation Group
NBM Nordic Balancing Market
NEMO Nominated Electricity Market Operator
NRA National Regulatory Authority
NTC Net Transfer Capacity
NUCS Nordic Unavailability Collection System
PTR Physical Transmission Right
PX Power eXchange
RCC Regional Coordination Centre
SO GL System Operation Guideline
TSO Transmission System Operator