Skip to content
Nordic Regional Coordination Centre
Menu
  • Home
  • Services
  • Strategy
  • News
  • Flow-based
  • Team
  • Career
  • About
  • Overview of Capacity Calculation Methodology (CCM) project
    • CCM project
    • Flow based basic information
    • CCM project different timeframes
    • Abbreviations
  • Methodology and processes
  • Updates and newsletter
  • Upcoming Stakeholder Events
  • Day-ahead (DA) and Intraday (ID) (ATCE) Capacity Calculation
  • DA/ID (ATCE) CCM EPR
    • Simulation Results
    • Q&A EPR
    • Stakeholder meeting material from EPR events
  • Post go-live of DA/ID (ATCE)
    • Q&A post go-live
    • Stakeholder meeting material from post go-live events
  • Intraday (ID) Flow-based Capacity Calculation
  • Long-term (LT) Capacity Calculation
    • Stakeholder material
  • Balancing timeframe (BT)

CCM project different timeframes

The Nordic Capacity Calculation Methodology (CCM) project is responsible for the methodology development of the Nordic Capacity Calculation Methodologies for the timeframes Day-ahead (DA), Intraday (ID), Long-Term (LT) and Balancing timeframe (BT).

Day-ahead and Intraday (ATCE) capacity calculation

Intraday capacity calculation

Long-Term capacity calculation

Balancing Timeframe capacity calculation

Copyright © 2022 Nordic Regional Coordination Centre

Login with AzureAD