CCM project different timeframes
The Nordic Capacity Calculation Methodology (CCM) project is responsible for the methodology development of the Nordic Capacity Calculation Methodologies for the timeframes Day-ahead (DA), Intraday (ID), Long-Term (LT) and Balancing timeframe (BT).
Day-ahead and Intraday (ATCE) capacity calculation