Documents & Presentations
General documents
List of abbreviations
Stakeholder consultation document and Impact Assessment for the Capacity Calculation Methodology Proposal for the Nordic CCR
Upcoming meetings - 2023
Stakeholder meeting, 27 March 2023, 09:30-16:00 CET, Hybrid meeting (Stockholm Arlanda Airport, SWeden + Online via Teams) CLICK HERE TO JOIN!
Focus: Status updates and result elaborations, NRA KPIs and the 3-month reports + breakout-sessions to meet CCM experts.
2. Current status and overall timeline
3. NRA KPI elaboration and 3-month reports, approval process
4. Public consultation elaboration
7. TSO feedback
The agenda was amended during the meeting to accomodate the ongoing discussion. The agenda points 8-9 on the break-out sessions was excluded. A new presentation was added between agenda points 5-6. This presentation will be uploaded shortly.
Stakeholder meeting (hybrid), 3 May 2023
We plan for a hybrid stakeholder event focusing on the public consultation and the elaboration of the NRA report content. More information will follow.
Material from meetings in 2023
Stakeholder meeting (digital), 9 February 2023
The meeting focused on the status update and the EPR result elaboration.
Agenda
1. Welcome and opening words
2. Current status and overall timeline
3. Result elaboration DA
4. Result elaboration ID (corrected) Please note that slide 6 has been corrected after the event. An error occured when preparing the presentation, causing the slide to contain incorrect data. The original slide 6 is available here
5. AOB and closing remarks
Meeting minutes
Material from meetings in 2022
Webinar on the Nordic TSO proposal for the Balancing Timeframe Capacity Calculation Methodology, 7 October 2022, 14:00 - 15:00 CET
Stakeholder meeting (hybrid meeting), 29 June 2022, 09:30 - 15:45 CET
Teams/on-site at Copenhagen Airport
Agenda - Stakholder hybrid meeting, 29 June 2022
1. Welcome, EPR overview progress, timeline, evaluation report
2. Nordic CCM Steering Committee_Flow-based in a larger context
3. NRA_Evaluation of the report and EPR outcome
4. RCC_About RCC, activities to support FB CC and MC during EPR
5. NEMO_Involvement to facilitate EPR and foreseen path after go-live
6. Stakeholder experience on Core FB parallel run
7. EPR results on DA and ID
8. NUCS_LT
Meeting minutes
Stakeholder Meeting (webinar), 12 May, 2022, 9:00-11:30 CET
Agenda
1. Welcome and opening words
2. External parallel run simulation results
3. NRA KPIs
4. Publication locations and definition of published data
5. ATCE concept, TSO feedback on SH comments, preliminary observations of ATCE results
6. Closing remarks and AOB
Meeting minutes
Click here to provide feedback on the meeting! Please provide feedback no later than 26 May 2022.
Stakeholder Meeting (webinar), 23 March, 2022, 9:00-12:00 CET
Agenda
1. Welcome and opening words
2. Summary of SH feedback on IPR market reports
3. Introduction to simulation facility
4. Capacity calculation statistics of external parallel run
5. Internal parallel run results presentation part 1-2
6. Data publication for external parallel run. Live viewing, no presentation available.
7. AOB and closing remarks
Meeting minutes
IN-DEPTH WEBINAR, 17 MARCH 2022, 09:00-12:00 CET
Focus: What to expect from the External Parallel Run
Agenda
1. Welcome and opening words
2. FB methodology pedagogical walkthrough
3. Overview of assumptions and parameters for the beginning of external parallel run
4. AOB and closing remarks
Meeting minutes
Click here to provide feedback on the meeting! Please provide feedback no later than 31 March 2022.
Stakeholder Meeting (webinar), 10 February, 2022, 9:30-11:00 CET
Agenda
1. Welcome and opening words
2. Status update of internal parallel run
3. Observations of the 2nd internal market report (week 40-43)
4. AOB and closing remarks
Meeting minutes
Archive: Material from meetings 2014-2021
Stakeholder Meeting (webinar), 16 December, 9:00-10:30 CET
Agenda
1. Welcome and opening words
2. Status update of internal parallel run
3. Status of IPR: Flow-based capacity calculation_pre-coupling
4. Preliminary observations based on Flow-Based market simulations
5. AOB and closing remarks
Meeting minutes
Stakeholder Meeting (webinar), 4 November, 9:00-11:00 CET
Agenda
1. Welcome and opening words
2. Status update of Internal Parallel Run
3. Fulfillment of economic surplus maximization in SDAC delivered via the PCR Euphemia algorithm
4. Criteria for starting external parallel run
5. TSO reflection on open questions from previous stakeholder events
Meeting minutes
Stakeholder Meeting on Intraday (webinar), 7 October
Agenda
Transitional solution for calculation and allocation of intraday cross-zonal capacities for continuous trading in the Intraday timeframe
1. Welcome and opening words
2. Flow-based capacity calculation, pre-coupling
3. Socio-economic welfare analysis, post-coupling
4. Relation between NTC and FB
5. ATC extraction for intraday gate-opening
6. Upcoming consultation
Meeting minutes
Nordic CCM presentations at the Nordic Stakeholder Reference Group Telco, 14 September
Internal Parallel Run: Flow-based capacity calculation, pre-coupling
Internal Parallel Run: Status
Stakeholder Meeting, Web Conference, 1 July
1.Welcome and opening words
2.Flow-based capacity calculation - pre-coupling
3.Socio-economic welfare analysis - post-coupling
4.Data publication
5.Key performance indicators (KPIs) for external parallel run
6.Recap of open issues - intraday transparency and hedging
7.New process for stakeholder involvement
List of abbreviations
Timeline
Meeting minutes Stakeholder meeting 1 July
Stakeholder workshop on FB and price forecasting, 22 February
0222021 minutes workshop on FB and price forecasting Feb 22 draft_V0
02222021 supporting slides Stakeholder meeting_V0
Stakeholder Group Meeting, Web Conference, 9 December 2020
12092020 Nordic CCM SHG_Vf
12092020 SHG minutes Dec 9 draft_V0
Stakeholder Group Meeting, Web Conference, 7 July 2020
07012020 Nordic CCM SHG_Vf
Concerns Vattenfall SHG 1 July 2020 v2
07012020 SHG minutes July 1 draft_V0
Stakeholder Forum, Web Conference, 6 February 2020
02062020 Nordic CCM SHF_V1
02062020 SHF minutes Feb 6 draft_V0
Stakeholder Group Meeting, Web Conference, 29 January 2020
01292020 Nordic CCM SHG_V1
01292020 SHG minutes Jan 29 draft_V0
Stakeholder Forum, Copenhagen, 12 December 2019
20191212 Nordic CCM SHF_V0
12122019 SHF minutes December 12 final_V0
Stakeholder Group Meeting, Copenhagen, 22 August 2019
20190822 Nordic CCM SHG_Vf
08222019 SHG minutes Aug 22 draft_V1
Stakeholder Forum, Web Conference, 25 April 2019
Stakeholder Forum, Stockholm, 11 December 2018
12112018 SHF minutes December 11 final_V0.pdf
20181211 Nordic CCM SHF_V0.pdf
Stakeholder Group Meeting, Stockholm 13 June 2018
06132018 SHG minutes June 13 draft_V0
20180613 Nordic CCM SHG_V0
Stakeholder Forum, Copenhagen, 11 December 2017
171211 SHF Copenhagen MoM_vf.pdf
20171211 Nordic CCM SHF_V0.pdf
NordREG consultation on CCM proposal 11.12.2017.pdf
Stakeholder Group Meeting, Copenhagen, 11 October 2017
11102017 SHG minutes October 11 final_V1
20171011 SHG Supporting Document V0
FlowBased-Vattenfall
Documentation on Capacity Calculation Methodology Proposal, 12 September 2017
20170912 CCM Legal Proposal
20170913 Supporting Documents and Impact Assessment for the Nordic CCM
20170912 Principles for Determining the Transfer Capacities
Stakeholder Forum, Copenhagen, 14 June 2017
20170614 CCM Forum Supporting Document
20170614 SHF Meeting Minutes
Stakeholder Forum, Stockholm-Arlanda, 17 April 2017
20170419 CCM Forum Supporting Document vf
Stakeholder Forum, Stockholm-Arlanda, 8 February 2017
02082017 SHF minutes 8 February final_V0
20170124 CCM Forum Supporting Documents v02
Stakeholder Group meeting, Stockholm 15 April 2016
15042016 SG minutes 15 April final_Vf
SHG_April 15_supporting_slides
Stakeholder Group Meeting, Copenhagen, 1 February 2016
5.Cap. Calc. methodology and preliminary FB results
10.Common Grid Model (CGM) used in the capacity calculation
01122016 SG minutes 1 Dec final_V1
SHG_Dec 1_supporting_slides
Stakeholder Forum, Stockholm, 14 December 2015
20151214 Alain Marien - Nordic FB Market Forum
20151214 Christophe Mestdag - Nordic FB Market Forum
20151214 Helene Robaye - Nordic FB Market Forum
20151214 Hoeksema-Claxton - Nordic FB Market Forum
20151214 Mats Nilsson - Nordic FB Market Forum
20151214 NordREG Nordic FB Market Forum
20151214 Statnett - Nordic FB Market Forum
20151214 Vidar Hansen - Nordic FB Market Forum
Stakeholder Group Meeting, Copenhagen, 26 November 2015
20151102 SHGROUP-M.1 Slide deck_Vfinal
26112015 SG minutes 26 Nov draft_Vf
Joint NordREG / Nordic TSO workshop on Flow-Based Capacity Calculation, Stockholm-Arlanda, 11 December 2014
1. Joint NordREG Nordic TSO workshop on Flow-Based - FB concept and methodology
2. Joint NordREG Nordic TSO workshop on Flow-Based - Status in the Nordic flow based project
3. Joint NordREG Nordic TSO workshop on Flow-Based - The Flow-Based process ongoing within the project
4. Joint NordREG Nordic TSO workshop on Flow-Based - Preliminary results from market simulations
5. Joint NordREG Nordic TSO workshop on Flow-Based - NordREG capacity calculation project
6. Joint NordREG Nordic TSO workshop on Flow-Based - Status CWE - evolution