Stakeholder meeting material from post go-live events

Online event on DA and ID Flow-based, 2 September 2025, 10:00 – 12:00 CET

1. Welcome and opening words
2. TSO reflections on flowbased in operation (obsolete) (Updated version on 15/09: 2. TSO reflections on flowbased in operation_UPDATED, see reasons below)
3. D-2 Preliminary FB domain publication
4. Overview of ATCE 6-month report
5. Introduction to FB ID project
6. AOB and closing words

Meeting minutes

Reason of updated slides:

The CCM project would like to acknowledge an error in the flow distribution analysis presented during the recent stakeholder event on September 2, 2025.
The analysis concerning the cuts in the Nordics was based on incorrect data handling, resulting in wrong aggregations. For example, there was an incorrect calculation of the South West Link's contribution on the South Cut (SE3-SE4 border). This miscalculation led to inaccurate conclusions regarding flow distributions.
The CCM project has reviewed and fixed errors and you can find a corrected version of the analysis in the updated slide above.

 

Nordic CCM post-flow-based go-live Stakeholder Meeting 5 February 2025, 09:00-12:00 CET

  1. Welcome and opening words
  2. TSO reflections on DA market outcome
  3. ID results and analysis after Flow-based go-live 
  4. SYSPOWER: Short-term analysis in FBMC environment
  5. Statkraft: Operational experience
  6. Any other business and closing remarks

Meeting minutes (updated on 03/03)

Flow-based domain forecasting online workshop, 23 January 2025, 09:00 – 12:00 CET

1. Welcome: Link to  video recording
2. Challenges of FB domain forecasting from producer perspective: Vattenfall (updated on 21/01/2025): Link to video recording
3. A data-driven approach to forecasting the flow-based domain: Volue (updated on 23/01/2025): Link to video recording
4. Medium-term asset valuation using flow-based modelling approach: Montel (updated on 23/01/2025): Link to video recording
5. PTDF Analysis: Insights from Detailed Grid Modeling: Montel Syspower: Link to video recording
6. Long-term Capacity calculation and NUCS project: Link to video recording Due to recording issues, the presentation view is not available in the video recording.
7. AOB: Link to video recording

The TSOs facilitate this workshop as a neutral platform and are not responsible for, nor do they endorse, the content or materials presented by external stakeholders. The views and information shared during the workshop are solely those of the respective speakers.